New York, NY  
line decor
Rachel A. Chicchi / Structural Option / 2008-2009
line decor
 
 
 
 

 
 

Final Report

The author does not have approval from the owner to post the final report for security reasons. A hard copy of the report is on file with the AE department.
 

 


 
AE Computer Labs
Contact Rachel Chicchi: rac281@psu.edu
 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Rachel Chicchi. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 
This page was last updated on April 30, 2009, by Rachel Chicchi and is hosted by the AE Department ©2008